2024–2024 |
Withstand tests on power cable link boxes |
2024–2024 |
Grounding system analysis for the open cycle gas power station Millbrook Power Limited (MPL) |
2024–2024 |
Grounding system analysis for the open cycle gas power station Hirwaun Power Limited (HPL) |
2023–2024 |
Withstand impulse voltage tests of protection devices |
2023–2024 |
Consulting services for the project "Line surge arresters for the 150 kV transmission system of Rhodes". |
2023–2024 |
Grounding system analysis for the open cycle gas power station Progress Power Limited (PPL) |
2023–2025 |
Preventive maintenance of the electrical equipment of the R&D department of RAYCAP |
2023–2025 |
|
2022–2022 |
High voltage withstand tests on Sheath Voltage Limiters |
2022–2023 |
Insulation coordination study for the Koumoundourou 400 kV Substation |
2022–2025 |
Insulation coordination study for the 400 kV GIS substation of "Aluminium de Grece" |
2022–2022 |
Insulation coordination study for the Fier and Elbasan 3 substations |
2021–2021 |
Tower ground resistance measurement of the 150 kV transmission system of Rhodes |
2021–2021 |
High voltage testing of protective devices against surge currents |
2020–2021 |
Technical specifications for line surge arresters for the 150 kV overhead lines of Rhodes |
2020–2021 |
Insulation coordination study for the 400/150 kV GIS Substation at Korinthos. |
2020–2020 |
Lightning impulse voltage withstand tests on protective devices against surge currents |
2020–2022 |
Insulation coordination study for Ag. Nikolaos 400 kV Substation |
2019–2020 |
Improving the lighting performance of the 150kV overhead lines of Rhodes |
2019–2019 |
Impulse voltage withstand tests on surge protective devices |
2018–2018 |
Impulse voltage and current tests on a surge protecyive devices |
2018–2019 |
Insulation coordination study for the energy project "GHANA BRIDGE phase 1 (5 x GTs LM2500, GT8) & phase 2 (phase 1 plus 1 x ST)" |
2018–2023 |
Development of commercial software simulating Partial Discharges for the optimum design and production of medium and high voltage industrial applications |
2014–2025 |
|
2010–2011 |
Insulation coordination study for the 150kV GIS substation and the power plant at Korinthos |
2009–2009 |
Protection of distribution transformers against overvoltages due to lightning surges. |
2009–2010 |
Insulation coordination study for the Ilarion Power Plant |
2008–2009 |
Electrical engineering Services / GIS 400kV/150kV substation at Aliveri |
2008–2009 |
Insulation coordination study- Aluminium de Greece S.A.I.C |
2008–2009 |
Electrical engineering consulting services for the ALIVERI Thermal Pwer Plant 416.95 MW |
2008–2009 |
Εlectrical Engineering Consulting Services - Ag.Nikolaos Power Plant 430 MW |
2006–2010 |
Distinction funds from Aristotle University's Research Committee |
2006–2008 |
Student's practical training in the Electricians Engeneering & Computers Engeneering Department |
2003–2008 |
Enhancement of the undergraduate curriculum of the Electrical and Computer Engineering Department at the Aristotle University of Thessaloniki |